In Bratislava´s Ružinov district, between Gagarinova, Mierová and Brodná streets, the construction of the Polyfunkčný objekt Mierová is planned, reports YIMBA.sk. This mixed-use project is being prepared by the developer RETEP, which has received a binding opinion from the city.
Two buildings with 14 and 7 floors will be connected by a basement with 2 underground floors. The total built-up area will be 2,068 sqm, and the total floor area - 17,595 sqm. The underground garage will offer 205 parking spaces and technical and storage premises. Object A will function as a hotel with 227 beds in 160 rooms. The hotel will be complemented by a restaurant, cafe, conference rooms, multifunctional hall, fitness, game room and offices. There will be 42 apartments in a residential building B. A small gazebo, a fountain and a children's playground are proposed in the inner block.
Last year, the city assessed an architectural study to obtain a binding opinion, it was necessary to incorporate the comments and requirements of the city. The construction schedule is not yet known, but construction will start in 2025 at the soonest.